Hi Toby,
I think you have used most of the necessary keywords for defining a SEDI-3D model. But there is one place that looks strange to me.
CONSTANT SEDIMENT SETTLING VELOCITY = -0.0006
I use a positive value here and it doesn't need a negative sign to indicate the direction. Maybe a positive value could help with the number of iterations.
I use version v7p2r1. So I can imagine there will be some differences in the source code, as well as in the keywords.
Here is my settings:
NUMBER OF TRACERS = 1
NAMES OF TRACERS = 'SEDIMENT G/L '
INITIAL VALUES OF TRACERS = 0.0
PRESCRIBED TRACERS VALUES = 0.01;0.01;0.01;0.01;0.01;0.01;0.01;0.01;0.01
TRACERS VERTICAL PROFILES = 1;1;1;1;1;1;1;1;1
COEFFICIENT FOR HORIZONTAL DIFFUSION OF TRACERS = 1.0E-04
COEFFICIENT FOR VERTICAL DIFFUSION OF TRACERS = 1.0E-04
SEDIMENT = YES
COHESIVE SEDIMENT = YES
MEAN DIAMETER OF THE SEDIMENT = 0.00005
DENSITY OF THE SEDIMENT = 2650.0
CONSTANT SEDIMENT SETTLING VELOCITY = 0.5E-3
HINDERED SETTLING = NO
BED LAYERS THICKNESS = 0.01
NUMBER OF SEDIMENT BED LAYERS = 1
INITIAL THICKNESS OF SEDIMENT LAYERS = 0.01
MUD CONCENTRATIONS PER LAYER = 500
EROSION COEFFICIENT = 1.0E-5
CRITICAL EROSION SHEAR STRESS OF THE MUD LAYERS = 0.2
CRITICAL SHEAR STRESS FOR DEPOSITION = 0.006
THRESHOLD FOR SEDIMENT FLUX CORRECTION ON TIDAL FLATS = 0.1
ADVECTION-DIFFUSION SCHEME WITH SETTLING VELOCITY = 0
But again, this is in v7p2r1...
Kind regards,
Qilong