Dear all,
I am setting up a telemac model to calculate some inundation areas. In the inundated area I have some weirs. As I undestand it, I would have to break the mesh completely in order to implement a weir (as in the "Weir" example file).
In my case, the weir is located in a valley bottom and the floodwave will also flow through the adjacent plane, i.e. around the weir.
The geometry looks something like this, so first the weir will operate normally, and with rising water levels the water will also flood the plane on the left abutment:
____________________
_____ /
\________/
\_WEIR_/
Is there a "proper way" to implement such a situation in Telemac? Can I only break the mesh in the location of the weir (=cut a hole in it)? I feel like completely breaking the mesh would result in problems regarding the overbank flow.
Thanks!