Hello!
I was verifying the velocity results calculated by telemac-3d and a trouble puzzled me.
I first used telemac-3d to simulate the tidal current in an area during 8.14 ~ 8.25, and verified the velocity during 8.23 ~ 8.24.The verification result is good.
But when I changed the simulation time to 8.14 ~ 8.24(Only simulate to the verification time period, no more calculation),there is an obvious error in the verification result (also 8.23 ~ 8.24).
It seems that the result has some errors at the last stage of a simulation.Could someone please tell me what are the reasons of these errors?